The WorkSafe website will be unavailable on Tuesday 16 September from 12pm–5pm due to planned maintenance.
Our other online services, including the online services portal(external link) and Energy Safety portal(external link), will remain available.
To notify us of an injury, illness or incident at work, visit our online services portal(external link). For urgent notifications, please call us on 0800 030 040. For general or non-urgent enquiries, email us at info@worksafe.govt.nz.
Court Summary - at a glance
Date of offence:
19 April 2022
Plea:
Guilty
Decision:
Convicted
Final decision date:
Fine imposed:
The starting point for the fine was set at $550,000, with discounts for co-operation (5%), remorse (5%), reparation (5%), previous good record (5%), guilty plea (25%). The end point for the fine has been suppressed.
Safety lessons learned:
The defendant failed to have:
- Ensured an adequate system was in place to capture, communicate and comply with the requirements of close approach consents and Field Service Provider safety briefings.
- Ensured the scaffold was dismantled in accordance with the requirements of the close approach consent and the Field Service Provider’s safety briefing.
Defendant name:
CPA 2022 Limited
Industry:
Building and construction
Date of offence:
19 April 2022
Facts in brief:
A scaffolder removing scaffolding around a residential dwelling was electrocuted when a scaffolding pole he was holding while dismantling the scaffold made contact with 33kV overhead power lines.
The defendant company had sought and obtained a close approach consent to operate in the proximity to the lines, but did not comply with the requirement of the consent to send the same workers who had received a safety briefing and installed the scaffolding to disassemble the structure.
The victim had both of his arms amputated, and lost the use of his legs due to the electrocution injuries.
The defendant company had sought and obtained a close approach consent to operate in the proximity to the lines, but did not comply with the requirement of the consent to send the same workers who had received a safety briefing and installed the scaffolding to disassemble the structure.
The victim had both of his arms amputated, and lost the use of his legs due to the electrocution injuries.
Offence section:
Sections 36(1)(a) and 48(1) and 48(2)(c) of the Health and Safety at Work Act 2015
Date(s) charged:
5 April 2023
Court:
Waitakere - District Court
Plea:
Guilty
Final decision date:
Decision:
Convicted
Fine imposed:
The starting point for the fine was set at $550,000, with discounts for co-operation (5%), remorse (5%), reparation (5%), previous good record (5%), guilty plea (25%). The end point for the fine has been suppressed.
Maximum fine available:
$1.5 million
Reparation:
Emotional harm – Suppressed
Consequential loss – Suppressed
Legal costs – $3,208.54
Consequential loss – Suppressed
Legal costs – $3,208.54
Related Documents:
Last updated